How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
国产精品无码久久综合| 小12萝裸体视频国产| 无码熟妇人妻av在线电影| AV成人午夜无码一区二区| 四虎影视在线影院在线观看 | 熟女少妇精品一区二区| 国产乡下三级全黄三级bd| 又大又粗又长的高潮视频| 最近中文字幕视频高清| 国产农村妇女aaaaa视频| 激情五月开心综合亚洲| 亚洲精品久久久久玩吗| 韩产日产国产欧产| 久久精品人成免费| 福利一区福利二区网页| 波多野结衣免费一区视频| 亚洲国产精品日韩av不卡在线 | 国产精品成人av四季| 国产9 9在线 | 中文| 成人国产精品一区二区免费看| 猫咪免费人成网站在线观看| 日本高清一区二区在线观看| 日本内射精品一区二区视频| 欧美激情一区二区三区| 伊人情人色综合网站| 亚洲最大国产精品一区| 精品午夜福利在线观看| 狠狠躁夜夜躁人人爽天天天天97| 亚洲综合色丁香婷婷六月图片 | 久久av无码αv高潮αv喷吹| 各种少妇正面bbw撒尿| 日韩欧美群交p片內射中文| 亚洲v天堂v手机在线| 人妻丰满熟妇av无码片| 国产免费无遮挡吸奶头视频 | 麻豆视传媒短视频在线| 五月四房播播| 中文字幕无码免费久久| 性欧美欧美巨大69| 精品久久久久久中文字幕大豆网| 亚洲中文字幕日产乱码高清app|