毛片24种姿势无遮无拦_中国丰满熟妇xxxx性_野狼第一精品社区_久久久精品波多野结衣_色一情一乱一伦一视频免费看

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
人成午夜大片免费视频| 国产日韩成人内射视频| 两个人的www免费视频| 日韩精品人妻中文字幕有码 | 老熟妇仑乱视频一区二区 | 18禁网站免费无遮挡无码中文 | 国产午夜三级一区二区三| 国产精品国产三级国AV麻豆| 成在线人免费无码高潮喷水| 国产精品无码一区二区在线 | 青青青伊人色综合久久| 成人性生交大片免费看| 亚洲黑人国产精品久久| 成人高潮视频在线观看| 亚洲乱码中文字幕在线| 91福利一区福利二区| 一区一区三区产品乱码| 日韩一区二区三区射精| av成人免费在线播放| 国产精品一亚洲av日韩av欧| 久久久久se色偷偷亚洲精品av| 色天天躁夜夜躁天干天干| 亚洲制服丝袜一区二区三区| 成年站免费网站看v片在线| 久久久久成人精品| 极品成人影院| 无遮挡1000部拍拍拍免费| 久久久久久久久久久国产| 久久久99久久久国产自输拍| 国产真实乱对白精彩| 人妻人人添人妻人人爱| 亚洲国产成人精品无码区宅男?| 国产最新进精品视频 | 国产三级精品三级男人的天堂,| 亚洲 小说 欧美 激情 另类| 国产成人亚洲精品无码车a| 婷婷成人丁香五月综合激情| 精品人伦一区二区三电影| 丰满亚洲大尺度无码无码专线| 亚洲av成人片色在线观看吉沢| 国产69口爆吞精在线视频喝尿|